ROBERTS

Chennai, Tamil Nadu | roberts@gmail.com | 555-5555-55


CAREER SUMMARY
  • Total 6.5 years of experience as Site Engineer in supply, Installation.
  • Testing &Commissioning of HT/LT switch gears (PMCC/MLDB/APFC/DBBV Panel), Transformer DGset, Cables, Highmast, lighting, Earthing etc.
  • Including allied works at Foreshore Terminal, Chennai, and Tamilnadu.
  • Site Engineer in MBLAL project IOCL Terminals for Design, supply, installation, testing.
EDUCATION
  • Diploma in Electrical & Electronics Engineering Sri Durgadevi Polytechnic College (A group of RMK Engineering College) – Chennai, Tamil Nadu in 2009
SUMMARY OF SKILLS
  • AUTOCAD (Less than 1 year)
  • MATLAB (Less than 1 year)
  • MS OFFICE (Less than 1 year)
  • WINDOWS 7 (Less than 1 year)
  • WINDOWS XP (Less than 1 year)
WORK EXPERIENCE
Project Engineer/QA & QC Planning Engineer

Indian oil corporation Limited – November 2014 to April 2017

Responsibility & Activity:

Erection:

  • Integration of pumps with PLC for Auto Sequencing in VFD systems.
  • Erection and Commissioning of Fire Engine control systems, ESD and MCP System.
  • Erection and Commissioning of UPS System and Integrating with GE PLC and 15KV DG SET.
  • Trouble shooting field instruments, wirings faults and performing corrective actions.
  • Calibration of gauges, transmitters and flow meters.
  • Performing hydro test.
  • Erection and Commissioning in Terminal interlocks.
  • Battery bank and battery charger panel erection.
  • Execution of fabrication, erection as per drawings and standards.
  • Installation of junction box, cable trays & cable laying.
  • Erection of panels, local instrument enclosures, local instrument rack as per the P&ID.

Quality Control:

  • Verification and inspection activities as per approved quality plans, procedures, standards and specifications.
  • Regular Surveillance/ Inspection of construction activities as per project ITP.
  • Preparation of documents like Inspection and test plan, Method statement for instrument installation, calibration, inspection and loop checks.
  • Handling material receiving inspections prior to the installation.
  • Undergoing factory inspections at vendor premises for skids and valves.
  • Review of documents like Calibration reports, Datasheets, loop drawings and Cable continuity reports.
  • Undergoing erection inspection for Terminal Automation system (TAS).
  • Involved in pre-commissioning and commissioning activities like loop checking, logic checks and start-up of systems.
Electrical Supervisor

UPL Third party of NTPC -West Bengal – January 2011 to November 2014

Responsibility & Activity:

Power Transmission System Operations:

  • Main scope is to handle 400kv switch yard and communicating to nearby substations such as ALAMATHY SS, MELAKOTTIYUR SS
  • Tie line NCTPS Lines and Isolating 400kv Lines on needed issuing Permits
  • Having technical conversation & communications with Power Grid Corporation of India, Southern Region Load
  • Dispatch Center Bangalore and Load Dispatch Center Chennai about power export and import in a formal manner
  • Updating current scenario about plant and its condition, power generation, power distribution, station consumptions and power flow monitoring, and submitting reports to my higher authority in a formal manner
  • Calculating scheduled and unscheduled generation and load demand and availability based tariff generation and its parameters, UI cost, fuel cost etc.
  • 400kv switch yard with Gas Insulated Substation operation and maintenance and Power Line Data Communication channel operation and regular monitoring and maintenance and relays monitoring operations

Electrical Operations:

  • Operating 400kv, 80Mva, 20Mva, transformers, SwitchGears, VCB, ACB, SF6 Breakers, operation required for the plant and maintenance
  • 250kva DG operation and maintenance, preventive maintenance of NI-CD battery set maintenance, LT& HT motors, operation and maintenance monitoring regular check-up of all operating equipment’s maintaining
  • The record of all operation and Maintaining log register for over all electrical operation of switch yard and substation’s overall plant Electrical operation SLD tracing, Electrical Scheme tracing C&I checking etc.
ADDITIONAL INFORMATION
  • Operating System: Windows XP / Windows 7.
  • Application packages: MS Office 2007 & 2013
  • Technical Packages: PLC Automation, Dcs, AutoCAD, MATLAB & Scads.